Mothercare HQ Development, Watford

Watford – 1585m2 – MF55 1.2 – and 1486m2 TATA D60 1.2 – 137m3 concrete pour – phased into 3 phases.

This was a challenging project with an extra 4 floors going on top of an existing building, and works above were going on while trades in the existing building were 2nd fixing, so the coordination and timing was critical for all works to be executed with precision.

Needless to say, the RMD team stepped up and communicated well throughout!