Stud Welding
Stud Welding for Composite Floor Decking
Certified, Reliable, Nationwide Suppliers of Stud Welding!
Stud Welding for Metal Floor Decking Applications
Our through service provides certified shear connection for composite floor decking and metal floor decking systems.
We deliver fully compliant service across the UK, supporting structural steel frames in commercial and multi-storey construction.
We support projects across the UK with fully compliant, on-site stud welding for multi-storey buildings, car parks, and commercial developments.
This is a critical part of installing composite floor decking, enabling the steel deck and concrete slab to act as a single structural unit.
Why Choose RMD for Stud Welding?
✔ Certified Through-Deck Welds –Secure shear connectors through metal floor decking into steel beams, essential for composite floor decking systems.
✔ Fully Mobile Nationwide Service –UK-wide stud welding for floor decking projects, with responsive teams ready to mobilise quickly.
✔ Trained & Qualified Welders –All operatives certified to UK standards (EN ISO 14555 / BS EN 1090) for compliant stud welding installation.
✔ Flexible Scheduling – Book alongside your floor decking installation or as a standalone visit after deck installation.
✔ Reliable Return Visits – Need post-install stud welding? We return to site fully equipped for safe, efficient completion.
✔ Compliant with Eurocode & SCI Guidelines – Every weld meets structural requirements for composite floor decking and steel frame construction.
Our service is designed specifically for composite floor decking systems, ensuring full structural performance between steel beams and concrete slabs.





How Stud Welding Works
Step 1 - Contact Us
Send your drawings or tell us the number of studs, deck type, and timeline.
Step 2 - Scope & Quote
We assess site access, decking spec, and fixings needed, then provide a clear quote.
Step 3 - Schedule Your Visit
We arrange a time that fits your programme, bringing all equipment and tools.
Step 4 - Complete the Works
Our qualified operatives complete all welds to code, safely and efficiently.
Applications
Composite floor slabs
Multi-storey steel frame construction
Car parks and office developments
Projects requiring post-decking shear connection
Check out our Stud Welding Guide here
Need More Than Stud Welding?
We also offer Supply Only, Supply & Design, and full Supply & Fix packages for roof and floor decking – so if you’re looking for a complete solution, we’ve got you covered.
Plus, you can add practical extras to your order, including:
Edge Trim & Flashing
Made-to-measure trims supplied with your decking for a seamless, precise slab finish.
Tool Hire
Hire screw guns, install kits, and handling tools for quicker, safer decking installation.
Fall Arrest System
Keep your site safe with certified safety netting and airbag solutions, installed by our experts.
Buy Back scheme
Return unused decking materials through our scheme to save money and cut waste.
Need Us On Site?
Looking for certified suppliers you can trust? Book as part of your decking order or as a standalone service, we’ll bring the tools, expertise, and speed.